Chief FHSVB Manual de instalación Pagina 5

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 8
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 4
Installation Instructions FHS110/ FHSV
5
Figure 4
Figure 5
6. Route cables and wires to display.
ADJUSTMENTS
To adjust display Roll, Pitch, and YAW tension:
1. Disconnect all wires and cable from the display.
2. Remove two Lower screws securing display to Centris cup.
3. Loosen two Upper screws securing display.
4. Lift display upward and away from mount.
5. Using a Phillips screwdriver turn the tension adjustment
screw clockwise to increase tension, or counter-clockwise
to decrease tension. (See Figure 6)
6. Re-install display.
Figure 6
4
(C, D, or E) x 4
3
(A) x 1
Display
1 1/2" NPT Pipe
4
(A) x 1
Display
1 1/2" NPT Pipe
(C, D, or E) x 4
Vista de pagina 4
1 2 3 4 5 6 7 8

Comentarios a estos manuales

Sin comentarios